Inland Waterways Association of Ireland


The Voice of Ireland's Waterways


craftinsure.ie

Barrowline Cruisers



Join and receive your copy of IWN!

Locations of visitors to this page

Dodder Public Transportation Opening Bridge: Public Consultation

Posted by P J 
P J
Dodder Public Transportation Opening Bridge: Public Consultation
16 February, 2018 11:08
Dublin City Council has commenced the planning and design of the Dodder Public Transportation Opening Bridge. The scheme comprises a new public transportation opening bridge over the River Dodder at its confluence with the River Liffey along with the construction of approach roads associated with the bridge; the construction of a new control building; the provision of a new club house and facilities for St Patrick’s Boat Club; the reclamation of land to the west of Tom Clarke Bridge to facilitate the build; the landscaping of the area between York Road/Thorncastle street and the R131 over the extents of the project.

The purpose of the proposed bridge is to improve the pedestrian, cyclist and public transportation accessibility between the Poolbeg Peninsula and the rest of the city and to allow the development of the proposed Poolbeg West Strategic Development Zone (SDZ). The bridge will be capable of opening to allow the passage of river traffic up and down stream. The Dodder Public Transportation Opening Bridge will connect Sir John Rogerson’s Quay to a new junction with the East Link Road (R131) in Ringsend. The proposed bridge will be able to accommodate a light rail system (LUAS) at some future date, whilst private cars will be prohibited from using the bridge.

Drawings of the proposed development are available to download at the links below:

Contact Information

If you have any observations or submissions to make relating to the bridge design as shown please mark them ‘Dodder Public Transportation Opening Bridge’ and forward them on or before Friday 16th of March 2018 to:

Post: Attn: Kevin Crotty

Road Design and Construction Division
Dublin City Council
Civic Offices
Wood Quay
Dublin 8
Phone: (01) 222 3066
Email: ROADCON@dublincity.ie

[consultation.dublincity.ie]
Reg
Re: Dodder Public Transportation Opening Bridge: Public Consultation
21 February, 2018 16:20
Just to make a couple of points having attended DCC consultation event in Ringsend last week. One of the consultants attended and dealt with queries.

This is only first stage in planning process with focus now on environmental impact.

There will be an ABP oral hearing later in 2018 where all concerns can be raised.

Confirmed that the opening span clearances are at 6.1m and 2.1 at high water which is an improvement on Eastlink.

Provision for LUAS tram will be via a circuit through the tracks. Consultant pointed out that this system is already in place on Sam Beckett bridge (which opens occasionally) so the existing Bus lane can be converted to carry a future tram if required.

There was also reference to a need for dredging around mouth of Dodder in preparation for bridge piers.

Also a detailed hydrographic survey, ie mapping the bottom around the general area will commence soon.
Reg
Re: Dodder Public Transportation Opening Bridge: Public Consultation
27 February, 2018 11:15
Important point I neglected to include in previous post is the deadline for comments on the Environmental Impact assessment is Friday 16 March.

Email address for submissions: roadcon@dublincity.ie Tel: 012223066

Dublin Branch Iwai intends to make a short submission.
Sorry, only registered users may post in this forum.

Click here to login

Online Users

Guests within the past 30 minutes: 13
Record Number of Registered Users (within a 30 minute window): 7 on 12 November, 2017
Record Number of Guests (within a 30 minute window): 384 on 10 June, 2017