MARINE NOTICE No. 09 of 2021 Shannon Navigation Ardnacrusha Headrace Canal Ardnacrusha Power Station to Parteen Weir Essential diving and civil engineering maintenance works

MARINE NOTICE No. 09 of 2021
Shannon Navigation
Ardnacrusha Headrace Canal
Ardnacrusha Power Station to Parteen Weir
Essential diving and civil engineering maintenance works

 From 15 Feb to 15 March 2021

Waterways Ireland wishes to advise Masters of Vessels and waterways
users on the Shannon Headrace Canal between Ardnacrusha Power Station
and Parteen Weir that essential diving and civil engineering maintenance
work will be taking along a section of the embankment between Clonlara
and Blackwater Bridges on dates between 15th February and 15th March
2021.

The Headrace Canal will remain open during these works and buoys /
markers will be placed in the canal to highlight the works area.
Waterways users are asked to maintain due attention when traversing this
section of the Shannon and to maintain their distance from the works.

Waterways Ireland wishes to thank its customers for their cooperation.

P Harkin
Inspector of Navigation
16 Feb 2021
Tel:00 353(0)90 6494232