WI has advised (MN#18 of 14/3/16) that L2 Ballyconnell will be closed from 14 to 25 March (weather permitting) for re-alignment of the navigation channel adjacent to the fixed landing stage on the lower level.  This remedial work is as a result of the flood levels experienced over the winter period. Further information +353 (0)71 96 50562